Wednesday, September 26, 2012

Week 9 -CAD work

Downloading Sketchup Pro in order to transfer files
For members of the urban theme group, a 3DSmax site model became available on blackboard. Although not so useful for project one, it could prove very handy for project two.

I intend to most likely use it to create my visualizations for my design and possibly create a flytrough video with it.

But as I was not profficient with the 3DSmax software, I transferred the file into google Sketchup Pro before saving it as a regular Sketchup file.

I had mixed results, as some file types transferred better than others. But I thought it may be worth posting this information, as some people I've spoken to are not aware this model was available and could be transferred to Sketchup in this manner.

Overhead View of the site, once model was transfered to Sketchup

Monday, September 17, 2012

Week 9 -Further Site Analysis


Overview of CBD and possible site locations

1

My first possible site location is located on the corner of Albert and Adelaide Street. Currently housing low-medium density commercial activities the building is already becoming outdated. Possible complications in regards to it being a protected structure. But a new development could be created above the building, structural issues to be resolved. The real plus of this site is the location -Adjacent to existing public transport infrastructure  By 2030, Adelaide street may also become an important pedestrian and light-rail thoroughfare.

2

The second possible site location has great potential for what I am ultimately aiming to do -renovate existing office space. Centered a corner of Queen Street and Albert Street, this is located in the heart of the CBD. As an area that is already pedestrianized  it is will become increasingly vibrant as pedestrianization spreads though the CBD. 

I envisage this area to become a Times Square or Piccadilly Circus'esque space by 2030. Not only a primary hub for business, but for leisure and entrainment  Coupled with this would also come the need for more accommodation and public space as increased density places more strain on facilitates. This would serve as an ideal environment in which a tower housing multi-purpose pods coupled with open 'green' levels could thrive and set a growing trend for high density urban solutions. 

The south-eastern corner of the site holds the most potential, currently containing a 24 floor office building with retail outlets on the lower levels. Looking to the future, much of this office space may become redundant, thus available for transformation. With a core structure already in place, this tower would be ideal to strip down and re-design. With a regular form and ceiling height, standardized untis can be
designed and installed in a variety of manners. Levels can be divided into different usages such as accommodation  workspace, retail and entertainment/social. With the facade removed and interior gutted, intermittent green spaces can easily be integrated with the design, which can also use existing access ways (elevator shafts).

The other corners on the site hold similar promise, but would be of a smaller scale without a new structure built above. All also hold great potential to improve the site surrounds. Possible transportation improvements such as light-rail and a subway network can also be integrated with the design.

 

3

The third site with potential for development is currently the Wintergarden car park on Elizabeth street. As public transport becomes favorable over private transport this may become a redundant space. With standardized spacing and access, this would be ideal for pod installations in line with some of our project one aims. With new office towers going up adjacent to the site and Elizabeth Street requiring a pedestrianization revamp, this site has a promising future.

4

Perhaps not the most favorable of sites due it's the scale and complexity, the Myer Center and adjacent street is none the less of of the most important components of this part of the CBD. One of the key draws of this area is the amount of unused roof top space that could be utilized for future redevelopment. A new rooftop precinct could be created here housing public green space a plenty, pod installations and connections to other buildings helping further integrate the CBD. It also presents the opportunity to improve the streets that surround the site -fundamentally altering the nature and aesthetics the area. But there is a lack of opportunity in terms of renovating existing interior space, as retail zones are unlikely to become redundant in the near future.

5

Further opportunities for renovation lie in smaller retail and office spaces such as this area on Elizabeth Street. Instead of working up or centrally, these redevelopments can be linear in nature, running along the length of Elizabeth street. This could create a new precinct through the CBD. Although there are issues to be resolved, in relation to access and protected structures.


Thursday, September 13, 2012

Week 8 -Preliminary Site Analysis and Design Breif

Below are key issues relating to the future direction of my design (Based on preliminary site analysis and positive outcomes from project one). Forming a peliminary breif to work from.......
  • Proximity to Queen Street is crucial.
  • The Myer Center or any large flat shopping is not a favorable option for an interior re-fit. Despite the pro's of utilizing the roof space, it would be easier and more appropriate by 2020-2030 to knock it down and redesign a new development.  
  • In accordance with our project one ideas, it is more feasable to renovate or reinvent redundent office space with portable design solutions, hosting the latest technology.
  • Based on initial site analysis, the best locations for project 2 are near Queen Street, but futher towards Albert Street and the city center as apposed to George Street and the river.
  • New design to consist of, or contain pods. These pods will have the latest touch screen technology and be multi purpose -for work, accomodation and entertainment. 
  • Green space in building's design also a fundimental factor. The combination of enclosed pods and open green space within a structural frame creating increased flexibility.
  • Catering for an environment of increasing density and intensity
  • What may the area be like in the future???? -Show overall city visions (context) and how design intergrates with it.

Week 8 -Assessment 1 Reflections

Below were key points raised upon reflection of our work and receiving feedback on it from others....
  • The importance of providing user-friendly, open plan environments was highlighted.
  • Designing with the Queensland environment in mind was important. Our design had a certain amount of exposure to the elements that could be considered as inadequate -what happens when it rains?
  • But recognized was a strong overall concept. One that encompassed new technologies, investigating how they may influence future work environments.
  • Could have had more visions for a contained POD, this idea could have been taken forward 
  • Overall, an okay piece of work.
  • For future work, best to focus our efforts towards implementing design schemes for a specific building.

Wednesday, September 12, 2012

Week 7 -Initial Ideas for assessment 2


Although not highlighted in our final project 1 presentation, we had a running idea in our development that highlighted the trip from South Bank to Fortitude Valley. This journey can be interpreted as making a section cut through central Brisbane, highlighting key environments and spaces within it.


Immediately progressing from the work done in project one, I approached 
the site in the CBD by viewing it through a section. 


I feel this 'route' is a great way to initially visualize my future Brisbane, as it covers a diverse range of urban environments and runs through the heart of our site. Due to the importance of this axis, I feel it is appropriate to base my project 2 location either on or close by to it. This route is already a key point of access to the CBD and will become increasingly fundamental as time progresses. 


This overhead view clearly shows the site area and the axis I discussed above, running
 through the site (Victoria Bridge and Queen St). This is a key area of focus for my 
site analysis and site selection.

Week 7 -Reading Reflections

Lynch's article highlighted how elaborate construction projects had been abandoned, as the tempo of change unrelentingly increased.

When it comes to versatility and flexibility, I ask ultimately how flexible can a building itself be? The structure itself is very unadaptable and any changes that are made are of contents and surrounding environments. Deductions and additions are also ways of creating change. You can't re-bend a concrete slab for example.

For me, choosing a flexible form for the future is futile. Flexibility and adaptability is what we make of it in the future, we worry too much about it and consume too much of our time trying to solve these 'yet to occur' problems in the present.