Wednesday, September 12, 2012

Week 7 -Initial Ideas for assessment 2


Although not highlighted in our final project 1 presentation, we had a running idea in our development that highlighted the trip from South Bank to Fortitude Valley. This journey can be interpreted as making a section cut through central Brisbane, highlighting key environments and spaces within it.


Immediately progressing from the work done in project one, I approached 
the site in the CBD by viewing it through a section. 


I feel this 'route' is a great way to initially visualize my future Brisbane, as it covers a diverse range of urban environments and runs through the heart of our site. Due to the importance of this axis, I feel it is appropriate to base my project 2 location either on or close by to it. This route is already a key point of access to the CBD and will become increasingly fundamental as time progresses. 


This overhead view clearly shows the site area and the axis I discussed above, running
 through the site (Victoria Bridge and Queen St). This is a key area of focus for my 
site analysis and site selection.

Week 7 -Reading Reflections

Lynch's article highlighted how elaborate construction projects had been abandoned, as the tempo of change unrelentingly increased.

When it comes to versatility and flexibility, I ask ultimately how flexible can a building itself be? The structure itself is very unadaptable and any changes that are made are of contents and surrounding environments. Deductions and additions are also ways of creating change. You can't re-bend a concrete slab for example.

For me, choosing a flexible form for the future is futile. Flexibility and adaptability is what we make of it in the future, we worry too much about it and consume too much of our time trying to solve these 'yet to occur' problems in the present.

Thursday, August 30, 2012

Week 6 -Individual Project One Statement

Below is the naritive for our concept. Our idea is essentially based around the idea that in the future work will become mobile and as a group we investigated the reprecussions which followed from this.


Back in 2012, Peter was a young and ambitious architect. Having recently started his own firm, he would commute from his residence in Brisbane’s northern suburbs to the CBD almost every working day. Peter’s journey used to consist of waiting in peak hour traffic morning and afternoon after his 9-5pm job hours. This journey took approximately 40minutes due to peak hour traffic congestion. His parking fees in the city were $20 a day, amounting to $110 spent per week on parking alone.

In 2014, the Brisbane City Tax was introduced making it too expensive to drive to work each morning. This resulted in a drastic strain being placed upon the public transportation sector, pressuring the government to amend the system that is currently in operation. Living in the CBD to avoid commuting expenses proved to be an unrealistic option for Peter. As renting prices were extremely high due to the convenience of its central location and resources. Job redundancies increased and businesses overheads remained constant, whilst income generation decreased.

But in 2015, with new technological advancements in interactive glass touch screens hitting the market. Peter’s architectural firm took the opportunity to become one of the first to invest in the technology. By introducing a digital communication strategy utilizing these new innovations, Peter’s firm became very successful. This technology enabled visual connections at any given time, promoting flexibility for all members of the firm to conduct work in any chosen environment. By 2030 this technology had become commonplace, significantly altering the traditional ‘nine to five’ working mindset.

Famous author and former web-designer Jason Fried conducted a study on work productivity, which determined office environments were relatively unproductive due to high levels of interruption.  With reference to the change of work attitudes, he concluded that people were more efficient and productive at a location of their choosing, where time could be used more efficiently. The use of new digital communication systems gave this time and freedom back to the people. Allowing them to work where they preferred, significantly benefiting the economy and increasing the quality of life for workers.



Following in the footsteps of Peter’s initiatives, digital communication installations within the CBD expanded prolifically in 2040. This resulted in a decentralization of business and many vacant levels within office buildings. They were no longer required. In-order to fill the void of floor space in the CBD, the nature and meaning of the city center had to adapt. Buildings had a larger functional emphasis on being mixed use, with the segregation of spaces being key to this. Typically split into three primary uses: work, living and entertainment.

Work
Developed by Peter’s fellow industry professionals, modular additions to cafes, public transportation and public spaces encompassed the latest technology, allowing work to be conducted productively within a hospitable environment.
The concept of Brisbane’s ‘Central Business District’ was replaced by one of, Brisbane’s ‘Central Lifestyle Hub”.

Living
These industry professionals also created modular apartment schemes, providing affordable accommodation in previously disused spaces. Realizing part of the Brisbane City Council’s 2020 vision, to generate a more mult­­­i-purpose and activated city center. ­Touch screen technology was integrated into the design of modular apartments, providing residents with even greater connectivity and freedom. Allowing them to live, work and play, where and when it suited them.

Entertainment
In 2030, Peter won a competition to retrofit the Myer Center, for which the parking spaces were vacant and unused since the introduction of the driving tax. This car park was an example of many spaces seen throughout central Brisbane. By 2040, many vacant car park zones and rooftops had been redeveloped into entertainment precincts, prompted by the success of Peter’s original car park transformation.


­­­­­­­­

On a larger scale, the decentralization of the CBD changed the cityscape of Brisbane. Surrounding the city, central nodes formed in the region of transportation hubs. Providing amenities for a working community that spent an ever-increasing amount of time at home.

Nowadays, Peter predominantly conducts business from his home in Brisbane’s northern suburbs. He likes to mix up his work environments; travelling to the city once a week for client meetings in Brisbane’s state of the art modular cafes. 

Week 5 -Reading reflections

Isozaki's article has great graphical sketches depicting, variuos wharehouse type designs. It also contains brilliant expanded diagrams and hand drawings, which are pleasing to the eye. The slightly cartoony style used, really expresses to me the concept and nature of the vision.The text has an engaging discourse of Cedric's story and some of his work. I didn't really take too much out of the reading, but great images none the less.

What a brilliant opening graphic for Kazi's page! That image of the building seemingly hovering above the stutting swiss scenery like a UFO, really sets the tone for the text to follow. It also explains alot what this firm's work is all about. Unconventional but thoroughly entriguing, the work of Diller Scofidio + Renfro is stunning, requiring a special breed of designers to collaborate and effectivly operate a multi-disiplanary firm of this nature. I love the attitude; forget what others are doing, you can call it what you want based on current trends but we make our own contexts. It's brilliant! What an inspiring mindset for creation. Too bad we are not allowed, or encouraged to operate in this frame of mind through the course of our studies. He concludes by quoating Scofido; "Obviously we are all interested in our next idea, but whether that can
be characterised as newness, who knows? It’s new for us". I disagree. Although it is open to different opinions depending on ones perspective; I still maintain that (within design) ultimately, everything is borrowed, everything is recycled, it is all very old.

Sunday, August 19, 2012

Week 5 -Future visions and scenarios


My Brisbane CBD vision 2032

 My Brisbane CBD vision 2062

Week 5 -Architectural possibilities

The Shanghai tower is the building of the future happening today. With a concept of sustainable communities being literally staked upon one another to form the double skin tower.
http://archrecord.construction.com/projects/portfolio/2012/05/shanghai-tower.asp








     Our architectural design possibilities